Submitted by DJ DePanicis
Wabash Caboose
With some time off from school coming up for me, I plan on being out to work both the Saturday and Sunday between Christmas and New Years (Dec 28/29).
-Notching and installing rafters
-Begin installing interior/exterior siding
-Misc. jobs that arise
If you can make it out, let me know. I feel that we can knock out a ton of work in these two days. All of the material is at the shop and ready to be used. WD is also putting the SD9 in the shop at the beginning of the year and our plan is to have the SD9 pull the caboose out of the shop (Both Finished!!!) How cool would that be??
If I don’t see you before, Merry Christmas and A happy and productive New Year!!
David DJ DePanicis
DJ@fwrhs.org